Skip to project
PUBLIC DEMO A fictional production. Changes stay in this browser.AI features are off
Log in

Try a production change. Save a draft, notify departments, or ask for approval.

DEPARTMENTS / GRIP

Grip

Prepare rigging and movement with access and lighting requirements in view.

DEPARTMENT WORKSPACE

Rigging & movement

Connect the movement plan, light control and location constraints before loading the truck.

Compact slider

Package
Camera movement
Access / surface
Break down for 0.9 m door
Needed
Day 1 / Sc 3

Door clearance is recorded alongside the shot rather than buried in an email.

Negative fill

Package
4×4 solids
Access / surface
Freestanding / no wall fixing
Needed
Cottage

Flag positions follow camera angle; final support by the key grip.

Window control

Package
Frames / diffusion
Access / surface
Protect oak floor
Needed
Day 1

Coordinate stand footprint with electric and the room dressing.

Coast wind cover

Package
Small protected setup
Access / surface
Weather review required
Needed
Day 2

Any exterior frame use remains subject to the qualified crew weather assessment.

Stage access

Package
Clear loading lane
Access / surface
Ground-level scenic landing
Needed
Day 3

Separate the performance area from the loading lane.

Wrap inventory

Package
Frames / clamps / bags
Access / surface
Count / condition
Needed
Nov 6

Track shortages against the issued package before the rental return.

Confirm footprint and access with locations, then share the working plan with camera and electric.

Shared requirements & dependencies

Sample workspace for grip. Open a prep item to change its status, inspect dependencies or follow it back to the scene.

1 requirements
GripIn progress

Window control and compact camera support

Compact slider, 4×4 negative fill and lightweight window diffusion. Location door clearance is 0.9 m; break down equipment before carrying it inside.

Jules Reed

Keep the next department informed.