Try a production change. Save a draft, notify departments, or ask for approval.
Edit production information DEPARTMENTS / TRANSPORT
Transport Connect pickups, parking and vehicle access to the day’s plan.
DEPARTMENT WORKSPACE
Moves, pickups & vehicles Make pickups, technical loading and company moves readable in the same plan.
Export department Records · 6 Day out of days References Documents
Search this department Needed onAll days & prep Day 1 · Tue, Nov 3 Day 2 · Wed, Nov 4 Day 3 · Thu, Nov 5
Day 1 cast shuttle
Passenger / load Mara / Ellie
Route / vehicle Harbour base → cottage
Pickup → arrival 06:05 → 06:20 HMU and costume receive the cast before first blocking.
Sc. 2 · Tue, Nov 3
Prep statusReady In progress Needs review Day 1 technical load
Passenger / load Camera / sound
Route / vehicle Base → west gate
Pickup → arrival 06:00 → 06:15 Use hand-carry access; carts do not enter the cottage.
Sc. 2 · Tue, Nov 3 Sc. 3 · Tue, Nov 3
Prep statusReady In progress Needs review Day 2 early unit
Passenger / load Cast / small crew
Route / vehicle Base → inland turnout
Pickup → arrival 05:15 → 05:35 Confirm weather and access before issuing the pickup list.
Sc. 1 · Wed, Nov 4
Prep statusReady In progress Needs review Picture vehicle delivery
Passenger / load V01 station wagon
Route / vehicle Hire yard → turnout
Pickup → arrival Day 2 · 05:30 Condition photographs and vehicle release stay with vehicles department.
Sc. 1 · Wed, Nov 4 Sc. 8 · Wed, Nov 4
Prep statusReady In progress Needs review Day 3 stage move
Passenger / load Unit equipment
Route / vehicle Base → Stage B
Pickup → arrival 11:00 → 11:20 Loading lane remains clear for scenic and electric access.
Sc. 5 · Thu, Nov 5 Sc. 6 · Thu, Nov 5
Prep statusReady In progress Needs review Wrap & returns
Passenger / load Rental packages
Route / vehicle Stage → rental houses
Pickup → arrival Nov 6 Confirm every package is signed off before the return run.
Prep statusReady In progress Needs review A call-time or location change should reach transport before the next list is issued.
Shared requirements & dependencies Sample workspace for transport. Open a prep item to change its status, inspect dependencies or follow it back to the scene.
Status All statuses Ready In progress Needs review 1 requirements
Day 2 shuttle and load-in Two crew vans from fictional Harbour Base at 05:30. Equipment van loads separately. Keep the cottage access lane clear and confirm headcount with production.
Sc. 1 Sc. 4 Sc. 8
Drew Ash Open requirement →
Keep the next department informed.